City Of Redding PLAN CHECK SUBMITTAL 777 Cypress Avenue ...
• Seismic Zone 3 • Basic wind speed (75 mph) • Snow load (30 psf, nonreducible) ‘ Two sets of structural calculations, ‘Identify exit lights/emergency lighting ‘Fire extinguishers ... Get Document
WARRINGTON TOWNSHIP CODE ENFORCEMENT
Can be referred to the Commercial Building Inspectors Office prior to submission to make certain of information. Structural load calculations, wind loads, snow loads, seismic, etc. e. Completed electrical floor and ceiling plans where new lighting systems are being installed. ... Get Document
Single-Phase Central Lighting Inerters - Dual-Lite
D Series Single-Phase Central Lighting inerters Application Designed for indoor installation in commercial or industrial applications. Operation When normal utility-supplied power is present, the LSN model central lighting inverter ... Document Viewer
COMMERCIAL / INDUSTRIAL TENANT IMPROVEMENTS
COMMERCIAL / INDUSTRIAL TENANT IMPROVEMENTS NUMBER REQUIRED SUBMITTAL •Design loads ( roof, floor, wind, codes, seismic zones and factors ) •Index of drawings I: •Include heat loss calculations and lighting budget. I: ... Document Viewer
Valley River Center
Plumbing content updated to include Seismic Gas Shutoff Valve (t10) September, Lighting t4 Material/Equipment Specifications, Fire Alarm System - Life Safety t5 Mechanical Criteria t6-t8 ing loads for the space and calculations for exhaust and make-up air. ... View This Document
Lateral System Analysis (Tech 3)
Seismic Loads lighting, acoustics, and so forth. Commercial space is located on the first and second floors, Table 8: Seismic calculations . Technical Report 3 Christopher VandeLogt Structural Option Page 22 November 16, 2011 ... View Full Source
Commercial Submittal Guidelines For Non-Fast Track Permits
Seismic importance factor, I e. loads and design calculations. T C -Scaled floor plans and reflected ceiling plans indicating lighting and power, wiring diagrams, location of -Location of unit heaters, ventilators, rooftop units, heat pumps, duct heaters, ... Get Document
City Of Greenville Commercial Construction Plan Submittal Guide
Commercial Construction Plan Submittal Guide General Requirements ___17. Indicate design dead and live, wind, snow, and seismic loads for floors, roofs, balconies, porches, breezeways, corridors, stairs, mezzanines, Indicate lighting plans with circuitry. ___8. ... Content Retrieval
Tenant Design Criteria Section T - Macerich
Plumbing content updated to include Seismic Gas Shutoff Valve (t10) September, 2011 Telephone Service, Lighting .. 5 Material/Equipment Specifications ing loads for the space and calculations for exhaust and make up air. ... View Document
COMMERCIAL BUILDING PERMITS INFORMATION GUIDE INFORMATION ...
• Exterior lighting and walkways (lighting to comply with City Lighting Ordinance imbalanced snow loads and seismic calculations. Seismic calculations need to include 40% of snow loads. and water pipe sizing calculations. • Mechanical plan with heat loss calcs, unit schedule ... Read More
Commercial Building Code Summary (Appendix B)
Emergency Lighting: No Yes. Exit Signs: No Yes . Fire Alarm: No Seismic (IE) _____ Live Loads: Roof _____ psf. Mezzanine _____ psf. heat output of unit. cooling output of unit. Boiler. total boiler output. ... Read Here
Final Report
Seismic Loads Seismic Load Calculations .. 63 Appendix D: Story Loads other firms Figure were also employed to handle MEP, lighting, acoustics, and so forth. ... View This Document
Structural calculations stamped and signed by an Idaho licensed engineer. Smoke & heat vent locations and dimensions [Page(s) Specify design loads and material specifications ... View Doc
City Of Binghamton Design Document Guideline Plan Review And ...
Plan Review and Approval for Commercial or Residential Occupancies To ensure prompt, and seismic loads upon which design is based. 5. Column loads and column schedule. 6. Typical Provide room by room heat loss and design calculations for each typical building. Identify duct work ... View Doc
FIRE PROTECTION SUBMISSION PACKAGE January 2012
Provide a plan that shows egress calculations, occupancy loads and uses for travel distance, exit widths, emergency lighting and exit signs in accordance with IFC the IBC P FIRE PROTECTION supports and supporting construction and designed to carry the gravity and seismic loads. ... Read Document
September 27, 2001
Suspended ceiling system and typical mounting/support details including seismic bracing. heat pumps, Type I or Type II exhaust fans, Provide a complete LIGHTING PLAN identifying all existing, new or relocated lighting ... Get Content Here
NEW COMMERCIAL / INDUSTRIAL BUILDINGS OR ADDITIONS
1 ENERGY FORMS (NREC)/ HEAT LOSS CALCULATIONS X 1 SEWER PERMIT/SEWER PERMIT (Before Permit Issuance) – Pierce County X •Design loads ( roof, floor, wind, codes, seismic zones and factors ) •Indicate locations of exit signs and emergency lighting fixtures. ... Get Document
CODE COMPLIANCE REVIEW CHECKLIST
Exit Signs BC1011 Emergency Lighting BC1006 Accessible Means of Egress BC1007 Area of Refuge BC1007.6 Access-Controlled Egress Doors BC1008.1.3.4 Commercial (101.5) Yes (If yes (IW): Snow (IS) Seismic (IE) Live Loads (BC1607): Roof psf Dead Loads (1606): Roof ... Fetch Content
Design And Construction - Chenango
Emergency Lighting BC1006 Fenestration solar heat gain coefficient: Duct insulation – R-value Pipe insulation – R-value Mechanical Seismic (IE) Live Loads (BC1607): Roof psf Dead Loads (1606): Roof psf Floor ... Access This Document